News Releases

6/15/2018 - 2018 Mastic Surface Project

On Monday and Tuesday, June 18 and 19, Circle C Paving of Goddard, Kansas will add a mastic surface treatment to the following residential streets in the City of Salina, weather permitting:

M

T

18

19

A Marie

M

T

Adam Travis

M

T

Brookefield

M

T

Deven

M

T

Dunnwood

M

T

Kasyn

M

T

Lorianna

M

T

Piercy

M

T

Redhawk

M

T

Ridgehill

M

T

Stonepost

M

T

Sunset Ridge

M

T

Westchester

M

T

This preventative thin surface maintenance tool is used to help extend the life of a road by placing a mixture of asphalt emulsion, fine aggregate, polymers, and catalysts over an asphalt surface that is minimally distressed but shows signs of weathering.  Rejuvenating the surface of an asphalt pavement earlier and at less cost with a very thin treatment may keep surface weathering and cracks from forming prematurely.  Lower volume streets treated with mastic surface treatment should see similar life-span results as other surface treatments.

The streets will be closed to traffic from 8 a.m. to 5 p.m. but may be opened earlier if the work is completed.  Residents will be notified to remove their cars from the streets prior to the construction.

The $30,000 project is a part of the City of Salina’s 2018 $4.7 million maintenance capital improvement program.